top of page
Fundesur

Repair of the Operating Room 1 at the General Hospital of the South

by Fundesur / News / 29 julio, 2019


We have performed the repair of the Operating Room 1 in the General Hospital of the South, and we have equipped it with a surgical table, anesthesia machine and a cellly lamp, product of a donation management to Project C.U.R.E, with which from the date it is being operated and br thus indicating the optimal conditions that its patients require on a daily basis.




0 views0 comments

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
bottom of page